INDUSTRY IN OPERATION

Check contractors before the next shutdown

Plan identity, right to work and authorisation checks before contractors reach the gate.

Discuss your site shutdown

A shutdown is planned over months and carried out in days. During that week, staff from dozens of contractor firms pass through — many of them subcontractors to your subcontractors, and some of them in Sweden for the first time.

The access control system answers whether the person may come through the gate. It does not answer whether the person is allowed to work on the site at all: whether the identity is verified, the work permit is still valid, the posting has been notified and the right training is in place. That is the question Sistec owns.

The difference only shows when something goes wrong. That is when you have to show what you checked, when, and on what basis.

THE RISK

What actually goes wrong

  • The chain runs deeper than you think. The contract is with the main contractor, but the person at the gate is employed at the third tier — often by a company you have never seen.

  • The check happens once. A work permit that was valid at enrolment may expire in the middle of the shutdown. Without continuous monitoring, nobody notices.

  • Postings go unreported. A foreign company sending staff to Sweden must notify the Work Environment Authority. The duty to verify that it happened lands with you.

  • The evidence sits in binders. When an authority, an insurer or a client asks, you cannot show in an afternoon who was on site and what was checked.

HOW IT WORKS

From order to access

  1. The contractor is invited

    You enter which companies will work during the shutdown. Each company gets a link and registers its own staff — no more collecting lists over email.

  2. Identity is verified

    The person presents a passport or national ID. The document is read by chip, UV and IR, and the face is matched against it.

  3. Right to work is checked

    Work permits, residence permits and citizenship are checked against the authorities' sources. Posting status is checked against the Work Environment Authority.

  4. Authorisation and induction

    Site induction, client-specific requirements and mandatory training are recorded before the person is let in.

  5. The decision reaches access control

    Sistec says yes or no to your access partner. Authorisation lasts only as long as the underlying documents do — an expiring permit revokes access.

WHO SAYS SO

On the partnership with SSG

Swedish industry faces ever higher security requirements. Through our partnership with SSG we make it easy to ensure that everyone granted access really is who they claim to be. Verified Identity raises security and builds trust throughout the supply chain.
Gustaf BromanCEO, Sistec
SSG Skillnation is the industry's shared platform for competence and authorisations. By integrating Verified Identity we add a new dimension — the ability to verify, in a standardised way, that the competence belongs to the right person.
Magnus BjörkHead of Product, SSG
CUSTOMER EXAMPLES

Completed assignments in industry

The steelworks project in Boden

Stegra, described in 2024

Challenge
Before the steelworks project, contractor personnel needed to be identified.
What Sistec did
Subcontractor contact, permit guidance and in-person identity checks connected to ID06.
Completed assignment
One coordinated check process for contractor personnel, described by Boden municipality in February 2024.
Read about the approach – Boden, 2024

Refinery

Preem

Challenge
Before Preemraff’s maintenance shutdown, contractor personnel needed checks before working on the site.
What Sistec did
Sistec contacted every contractor and offered identity checks, right to work verification and ID06 connection.
Completed assignment
Contractors had support with their checks before the shutdown, with a dedicated support line for questions.

Planning a shutdown?

Tell us how many contractors you expect and when, and we will come back with a plan.