CONSTRUCTION SITE & ID06

Who should have access to your construction site?

Bring access cards, enrollment and contractor checks into a clear workflow before the first working day.

Discuss your construction project

On a construction site the workforce changes every week. Subcontractors come and go, and for most construction projects the requirement for an electronic staff ledger applies every single day (exceptions exist, including for projects below four price base amounts and certain private developers).

The ID06 card shows that the person is registered. It does not show that the identity behind that registration was verified, that the work permit is valid today, or that the posting was notified — and those are the things an inspection looks at.

THE RISK

What usually breaks

  • The ledger does not match reality. People are registered after the fact, or not at all, and the gap only surfaces during an inspection.

  • The card exists but the basis does not. A valid ID06 card says nothing about whether the work permit is still valid.

  • Nobody knows who subcontracts to whom. The chain lives in contracts, not in a system you can search.

HOW IT WORKS

From enrollment to access

  1. The contractor registers their workers

    Personal details and required documents are registered in the enrollment portal.

  2. Pre-check and booking

    Sistec reviews the registration and the worker is booked for an identity check at a Sistec office or on site.

  3. Identity and document check

    Passport or national ID is read by chip, UV and IR. Work permits and posting are checked.

  4. Enrolment on site

    Site induction and client-specific requirements are recorded, and the person is entered into the staff ledger.

  5. Continuous monitoring

    Expiring work permits and authorisations are flagged in advance, so renewals happen before the person loses access.

CUSTOMER EXAMPLES

From wind farms to tunnels

Construction sites

Across Sweden

Challenge
Construction sites across Sweden – from wind farms in the forests of Norrland to tunnels underground – need to check their personnel on site.
What Sistec did
On-site checks with support for posting, ID06 administration and contact with authorities.
Completed assignment
Hundreds of checks at construction sites across Sweden.

Discuss your construction project

Bring access cards, enrollment and contractor checks into a clear workflow before the first working day.